RADIANCE ORBITAL Constellation operations
Shift
{{clock}} / 12:00 · {{utc}}
OP-1

{{headline}}

{{phaseChip}}

{{subline}}

{{controlHelp}}
PLAN CHANGED · YOUR APPROVAL NEEDED

RAD-08 is interfering with the reroute

Right after traffic moved onto the LEO-B bypass, RAD-08 began a scheduled momentum dump. Its terminal can't acquire the new cross-plane link from RAD-17 during it, so the bypass has no way back into LEO-A and is dropping packets. The system paused the plan and found a different route.

Was RAD-06 → LEO-B → RAD-08 Rejoins LEO-A at RAD-08, via RAD-17. Unavailable for about 18 min.
Now RAD-06 → LEO-B → RAD-09 Rejoins LEO-A one satellite later, via RAD-18. Adds 14 ms latency; no tasks affected.
Why not wait for RAD-08? Waiting uses 18 of the 32 minutes of thermal margin left on RAD-07. Nothing else in the plan changes. Your earlier reviews of steps 2 and 3 still stand. If you don't decide within 5 min, the system keeps the plan paused and pages the supervisor.
Wait for RAD-08 (18 min): uses 18 of 32 min of thermal margin; leaves little room if recalibration fails. Route via MEO: works now, but adds 42 ms latency for all LEO-A traffic.
PLAN ABORTED BY OP-1 {{abortText}} The situation is back with you. The 22:52Z default (safe-mode the terminal) still applies if no new plan is approved.
{{st.n}}
{{st.title}} {{st.status}}
{{st.detail}} {{st.meta}}
Check: {{st.check}}
{{f}}
This step can't be undone once it starts. The RAD-07 link is down for about 9 min while the terminal re-points.
Teach the system Back to mission view {{footNote}}